Log in to edit
Put In
Access Point36.17009, -85.02801
Description
Important to note that as of 2026, a new highway 127 bridge over clear creek has been built, and is too high to access the river from. It's assumed that 'old Hwy 127' will eventually be where you go to access the river, which is where this pin is located. Park downstream river-right up the hill a little, and use an old road down to the water within the right of way.