Log in to edit

Hemlock Dam Site Access

Access Point
Hemlock Dam Site Access

Description

Access is on river left on the upstream side of the bridge at the former Hemlock Dam site. This can serve as a take-out for the Trout Creek run or a put-in that provides a short run on a segment of Trout Creek that continues on down the Upper Wind.


Photos

Banner