Log in to edit

Road Construction

RapidClass V
Road Construction

Description

A double drop with several different entrances. The entrances have several pin spots.
There are two main lines. The river left, where the old sieve used to be and right of center.
There is a submerged rock on the right at the bottom and a large exposed rock on the left.
Scout from river right along the concrete wall.


Photos

Banner