With the flow study for the Green River complete, American Whitewater continues to work with the local utility and state regulators to develop a plan for re-licensing the hydroelectric project that includes recreational releases.

The license for the Green expires in 2015. The final flow study document is out. You can download it here: http://www.americanwhitewater.org/content/Document/view/documentid/1062/. Thanks to all the volunteers who helped out in fall 2011, especially the shuttle drivers and Applecheek Farm.

Morrisville Water & Light, the utility that operates the dam on the Green, is doing a habitat study on the river which should be out by 2013.

Join AW and support river stewardship nationwide!