BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//American Whitewater - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.americanwhitewater.org
X-WR-CALDESC:Events for American Whitewater
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20250309T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20251102T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20260308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20261101T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20270314T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20271107T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20261005
DTEND;VALUE=DATE:20261020
DTSTAMP:20260507T063126
CREATED:20260115T231141Z
LAST-MODIFIED:20260115T231141Z
UID:10000112-1791158400-1792454399@www.americanwhitewater.org
SUMMARY:Pit 1 Flows 2026 (CA)
DESCRIPTION:The Pit 1 reach (Class IV) of Northern California’s Pit River is expected to flow at boatable levels for much of October 2026 while both generating units at PG&E’s Pit 1 Powerhouse are offline for maintenance. During this period\, flows will not be diverted into the hydropower project and the river will instead flow at boatable levels\, fed by the largest springs in California. \nContinuous boatable flows are expected from October 5 through October 19\, 2026. The annual scheduled boating flows will occur within this window on October 9–11 and October 16–18\, with all-day boatable flows as required by the hydropower license. Outside of these scheduled flow dates\, the reach should run at similar boatable levels throughout the October 5–19 period\, though maintenance activities could cause some variability. \nFlows will upramp on October 5 and are expected to reach boatable levels by mid-afternoon. Flows will drop on October 19 at an undetermined time as maintenance concludes and powerhouse operations resume. \nThe annual scheduled boating flows result from American Whitewater’s advocacy during the federal relicensing of PG&E’s Pit 1 Hydroelectric Project in the early 2000s. Prior to this\, there were no guaranteed boatable days on the Pit 1 reach which\, absent PG&E’s project\, would have boatable flows year-round.  Learn more by watching Current Release: Pit 1 and check out the full run in our Pit 1 Rapids video.
URL:https://www.americanwhitewater.org/event/pit-1-flows-2026-ca/
LOCATION:Pit 1 River Access\, 24798-24550 Cassel Fall River Rd\, Fall River Mills\, CA\, 96028\, United States
CATEGORIES:Dam Release
ATTACH;FMTTYPE=image/jpeg:https://site-media.americanwhitewater.org/893186.jpg
END:VEVENT
END:VCALENDAR