Smith
2. Philpot Dam to North Bassett
| Difficulty | II+ |
| Length | 6.2 mi |
| Avg Gradient | n/a |
| Gauge | Smith River Near Philpott, Va |
| Flow Rate as of 35 minutes | 85 cfsbelow recommended |
| Reach Info Last Updated | April 4, 2024 |
River Description
This is swiftwater Class II paddling with two rapids that are Class II. Water is too swift at release levels for rank beginners but with any previous experience most paddlers will do fine.
One major tributary that comes in about half way is Town Creek. To see what Town Creek is adding to the level check the next gage downstream at Bassett.
See Also:
Virginia Whitewater, Roger Corbett (2000 ed.), p. 545.
Exploring Virginia's Waterways, Ed Gertler (2022 ed.), p. 315.
Smith Reaches:
1. Iron Bridge Rd(Route 704) to Union Bridge Rd at backwater of Philpott Lake, Class II-III
3. North Bassett to Fieldale, 8 miles, II
4. Fieldale to Doe Run, 5 miles, II
5. South Martinsville to Sports Complex, 4 miles, II
6. Sports Complex to Mitchell Bridge, 6 miles, II(III)
River Features
Take Out
Put In
Trip Reports
Log in to add a reportDid the Dam to North Bassett today at 650 CFS. It was a perfect level, and the river was moving pretty swiftly. It'd be a great level for beginners to work on their skills.