Big Laurel Creek
Hurricane to Hot Springs
July 2, 2013
Trip Report
| Reporter | Lee Thonus |
Pete Gutillo in the 4th step (where they start getting large). Level was 3 inches.
July 2, 2013
| Reporter | Lee Thonus |
Pete Gutillo in the 4th step (where they start getting large). Level was 3 inches.