Umpqua, South

1. Camp Comfort to South Umpqua Falls

Reach banner

June 6, 2017

Trip Report

ReporterPriscilla Macy

This bridge is scheduled to be removed in the summer of 2017 because logs kept piling up here and damaging the bridge. The new route to cross to NF 2823 is a short distance upstream at the Emerson Bridge, which is scheduled to be completed in 2017