| Difficulty | V |
| Length | 0.45 mi |
| Avg Gradient | n/a |
| Reach Info Last Updated | September 7, 2022 |
This section is bypassed by the Kents Falls Hydropower Development, but has ample water much of the time. It features a very long slide plus one additional slide. American Whitewater negotiated access areas that serve as both put ins and take outs for this run, as well as a realtime gage.
No river features have been added
No trip reports yet.