Otter Brook
East Sullivan to Otterbrook Park
June 8, 2012
Trip Report
| Reporter | Charlie Beyer |
The gauge on here is the same as the one for the lower stretch, I'm pretty sure its just the outflow from the dam, so it doesn't seem particularly reliable for the upper stretch. A better measure is the guage painted on the route 9 bridge at the put in. I ran it yesterday at one or a hair over on that guage and its was runnable but bumpy. I wouldn't run it lower than that.