Fall Creek
1. Etna to Forest Home
Trip Reports
Log in to add a reportFun little float - Will Wright
Apr 26, 2026
Flow: 425 cfs
Boat: Esquif Adirondack
Time on water: 3 hrs.
Put-In: Mill Dam Park in Freeville
Take-Out: Flat Rock before the pedestrian bridge (and before the low-head dam)
MDP to Etna: Lazy river float with a single set of Class I riffles just before getting into Etna. Multiple river-wide strainers; one requiring a portage.
Etna to Rt 13 Bridge: Some of the channels in braided sections looked like they had strainers during road-side scouting, but easy to pick clear channels from the water.
Rt 13 Bridge to Take-Out: One river-wide strainer requiring portage just a couple bends below the Rt 13 Bridge. Other than that a clean, easy run.
Will Jacobs
Apr 14, 2022
Currently no trees down between Etna and Rt 13. From Rt 13 to Flat Rock there are a few strainers. There is one tree spanning the entire river, it is soon after the abandoned Monkey Run bridge.
Angela Baldo
Apr 27, 2010
Put in at Etna at 3:30 pm, finished at Japes Lodge on Bebe Lake at 5pm or so.
A few low trees, but no major hazards. Big tree still down in flood plain after sand cliffs before Freese Rd.
Freese Rd. section in Varna uncomfortably low, barely passable. Another 6 inches to a foot would have been much better for that section.
Both of us ran the first dam and flatrock. Both walked Broken Dam - the landing looked kind of sketchy to us; might be better at higher flow. One of us ran Lover's Falls twice, the second time portaging up from the bottom to the ledge below the spillover.