Sandusky

2. Former Ballville Dam to Don Miller Memorial Park(Haunted Hydro Section)

Reach banner

August 29, 2001

Trip Report

ReporterCHRIS ERHARD

I HAVE RUN THE RIVER AT 2200 CFS AND IT IS AWESOME! THE LAST RAPID BEFORE THE TAKE OUT AFTER THE 'HAUNTED HYDRO' OR OLD POWER STATION TURNS INTO A HUGE WAVE TRAIN THAT TOWERS OVER YOU AS YOUR IN ONE OF THE TROUGHS.

Trip Report – Haunted Hydro Section | American Whitewater