Deer Creek
2. Ponderosa Way Bridge to Leininger Road Bridge(Lower Deer Creek)
December 3, 2019
THe Hard Part Was Getting to the Put-in
| Reporter | Dave Steindorf |
| Gauge Reading | 475 cfs at DEER C NR VINA CA |
After being high centered on the rock in the picture for about three hours, we finally made it to the put-in about 6:00 PM. The run was low but very doable. Ishi Falls was stout. We all portaged. Great two night trip.