Pigeon
1. Walters Power Plant at Waterville/Big Creek to Hartford Bridge(Pigeon Gorge / The Dirty Bird!)
October 8, 2025
Late Day Run
| Reporter | Andrew Evans |
| Gauge Reading | 1500 cfs at PIGEON R BL POWER PLANT NR WATERVILLE, NC |
| Flow | High Flow |
Looked up the damn release time on a duke energy site. Was sitting there at 5:30 pm ready to go when the water started flowing around 5:45. Great run, mainly long wave trains and some good sized holes. Took about 40 min. Good put in and take out.