Alerts are temporarily read-only while we upgrade them. Posting and editing will be available again shortly.
9-06-2008 Two trees down that require a portage around the half way mark (1/4 mile before the two main ledge drops). They were fairly easy to see and get out in today's low water run. However, would be very difficult if running the river high at 2 1/2' or 3 1/2 '. Hopefully I'll get around to removing them some time this fall, but don't count on it :)
No articles