Pilchuck Creek
2 - Pilchuck Creek Campsite to Highway 9 Bridge(Middle Pilchuck)
December 14, 2024
Upper and Lower Dec 8 24
| Reporter | James Good |
| Gauge Reading | 1500 cfs at Pilchuck Cr. @ Bridge 626 |
| Flow | Medium Flow |
There were various wood pieces in play, including 5 trees most or all the way across the channel, and all visible on approach. We needed to portage the same 2 as last year, got around far left on another 2, and slid over one that would be a portage at lower flows. With a group of 9, including 6 PFDs, it was a 4 hour run with no troubles. Happy to see the Ecology gauge is much improved!