Tygart Valley
3. Aggregates to the confluence with Beaver Creek(Loop)
| Difficulty | II-III+ |
| Length | 9.6 mi |
| Avg Gradient | n/a |
| Gauge | Tygart Valley River at Belington, Wv |
| Flow Rate as of 33 minutes | 3.26 ftbelow recommended |
| Reach Info Last Updated | February 17, 2024 |
River Description
Parking is very limited at Aggregates just below the Culvert bridge. Most boaters put-in at Norton under the bridge which shortens the trip 2.5 miles.
River Features
Long Put In - Aggregates
Distance: 0 mi
Put In - Aggregates. At or upstream from Aggregates; downstream from Elkins, WV.
Take Out - Beaver Creek near Gage, WV
Distance: 9.58 mi
Take Out
Take Out - Beaver Creek near Gage, WV
Trip Reports
Log in to add a reportCM
4.22' Gage
?
My girlfriend and i rand this at 2.9 too low although the twin giants were still runnable. Stay left on this rapid as the hydraulic to the right will hold you then spit you under the second large boulder, there is also a log pinned under the same boulder. Would be very fun about a foot higher.