Bad

A) Cayuga to Foster Jnctn. RR bridge (7.6 or 4.3 miles)(Upper)

Reach banner

May 14, 2005

Trip Report

ReporterAndrew Lovering

Erik Strahler coming down the final drop of Rocket Railroad Rapids
Here are the continuous class III drops leading up to the final series of III+(IV) drops of the Rocket Railroad Rapid. FUN!

Trip Report – Upper | American Whitewater