Vermilion

C) FS491 to CR24 (Crane Lake landing) (4 miles)(Chute-Gorge)

Reach banner
DifficultyII-IV
Length4.7 mi
Avg Gradientn/a
GaugeVermilion River Nr Crane Lake, Mn
Flow Rate as of 1 hour
1150 cfsabove recommended
Reach Info Last UpdatedApril 2, 2019

River Description

Section contains:

The Chute, a twisting 10' drop over a ledge and large boulders, followed by an undercut cliff (left) and an undercut rock (right) (class III-V). Scout the Chute river left...watch out for lots of Poison Ivy on trail.

Between these named drops lie 0.4 mile of boulder bed rapids (class II-III).

The Gorge, two steep ledges and a narrow canyon with sheer 50' walls (class III-V). Start extreme right through the upper 2 ledges. Move to river left to go through the gap on the far left for ledge #3. Then aim toward center of the narrow 'throat' section of the Gorge.


River Features

Put In

Distance: 0 mi

Take Out

Distance: 4 mi
Take Out

N
none

Jul 10, 2012


a look back up the Vermilion Gorge

the Chute at around 1500 cfs

the falls at around 1500 cfs 6/23/12