Etowah
2 - Hightower Road at Miles Berry Road to first Hwy 9 crossing
Trip Reports
Log in to add a reportScot Hanley
May 31, 2022
Private small steel bridge previously ~ 1 mile from put in has been washed downstream and now completely blocks the Etowah. The obstacle can be portaged on the left without exiting the river in 300-500 cfs. Beware in higher water.
Gentle Class 1's at Put In - Scot Hanley
May 31, 2022
Gentle class 1st at put in with depth of 2 feet but fast current.
Put in at Hightower Church Road and Miles Berry Rd NW of Dahlonega, GA - Scot Hanley
May 29, 2022
Headed north on Hightower Church road you will see a dirt road on the left as you approach the Miles Berry Rd intersection. A couple of mudholes to be overcome but made it thru in an Acura RDX 4 wheel drive. The path down to the river is right next to the bridge and will require a little bit of scrambling. No problems to report.