Greenbrier River
06. Spring Creek to Anthony
| Difficulty | I(III) |
| Length | 7.5 mi |
| Avg Gradient | 10 fpm |
| Gauge | Greenbrier River at Buckeye, Wv |
| Flow Rate as of 1 hour | 2.80 ftbelow recommended |
| Reach Info Last Updated | January 18, 2026 |
River Description
There is only one significant rapid on this reach. Tumble Rock Rapid is located about three miles above the takeout at Anthony.
River Features
Put In
Distance: 0 mi
Spring Creek
Tumble Rock Rapid
Class: IIIDistance: 6.96 mi
Rapid
Tumble Rock Rapid
Take Out
Distance: 7.53 mi
Take Out
Anthony Bridge
Trip Reports
Log in to add a reportNo trip reports yet.