Carmen-Smith Powerhouse is one of two powerhouses on EWEB's Carmen-Smith Hydropower Project (FERC P-2242) which includes three dams, and two powerhouses. The rated capacity of the total project is 124.5 MW.
Trail Bridge Dam and Powerhouse is one the dams on EWEB's Carmen-Smith Hydropower Project (FERC P-2242) which includes three dams, and two powerhouses. The rated capacity of the total project is 124.5 MW.