McKenzie
2. Carmen Reservoir to Trail Bridge Reservoir
Trip Reports
Log in to add a reportCarmen-Smith Powerhouse is one of two powerhouses on EWEB's Carmen-Smith Hydropower Project (FERC P-2242) which includes three dams, and two powerhouses. The rated capacity of the total project is 124.5 MW.
Trail Bridge Dam and Powerhouse is one the dams on EWEB's Carmen-Smith Hydropower Project (FERC P-2242) which includes three dams, and two powerhouses. The rated capacity of the total project is 124.5 MW.
The most challenging drop on the flow study of the
McKenzie River's Carmen reach.
The put-in for the Carmen reach at the Blue Pool
where the river emerges from subsurface flow.