Meadow Creek

Roadless

Reach banner
DifficultyIV-V
Length33.7 mi
Avg Gradient130 fpm
PermitNone
GaugeSouth Fork Clearwater River at Stites
Flow Rate as of 52 minutes
1130 cfsrunnable
Reach Info Last UpdatedJune 25, 2020

River Description

Meadow Creek flows 35 miles dropping over 4,500 feet through a remote region of Idaho.  The run is tiny at the top and is a large creek by the time it enters the Selway.  A significant part of the river corridor has no trails near the river, and the run contains multiple portages and sections of Class IV an V whitewater, alternating with sections of class II and III whitewater.   The river is almost entirely in an inventoried roadless area, lacking formal protection.

Paddlers usually take 3 days to do this run, but it has also been done in 2. Leave plenty of time for the shuttle, and be sure that the roads are clear of snow.

For photos and a great story about Meadow Creek, check out this AW article from the mid nineties.

http://www.americanwhitewater.org/content/Journal_show-page_issue_2_year_1994_page_42_


River Features

Put In

Distance: 0 mi
Put In

Take Out

Distance: 35 mi
Take Out

No trip reports yet.