Log in to edit
Opening sequence
Description
At the lowest boatable flows, this opening sequence may be a bang-and-thump-grunge (whereas most of the rest of the run may go fine).
However, with anything above minimal flows, this will be a freight-train rush with very few eddies for the first 0.25-0.5 mile!
For that reason it is very strongly recommended to scout the entire opening sequence (0.25 - 0.5 mile) before putting in.
Any fallen tree or branch can easily block this creek shore-to-shore and it may be nearly impossible to avoid disaster!