Log in to edit

Split Decision

RapidClass III

Description

After the creek swings hard left around a large boulder, the creek splits into three channels.  The main channel heads to the right toward a large rectangular boulder. The main flow heads down a flume to the left of the boulder.  At higher water levels, a more creeky line to the right of the boulder opens up.  However a new far left line is opening up and takes a lot of the flow from the main channel.  At levels below 4 feet, the main channel and left channel will be bony and require lots of rock dodging.


Photos