Log in to edit
Split Decision
RapidClass III
Description
After the creek swings hard left around a large boulder, the creek splits into three channels. The main channel heads to the right toward a large rectangular boulder. The main flow heads down a flume to the left of the boulder. At higher water levels, a more creeky line to the right of the boulder opens up. However a new far left line is opening up and takes a lot of the flow from the main channel. At levels below 4 feet, the main channel and left channel will be bony and require lots of rock dodging.