Hatfield Hydro has released its 2009 schedule of whitewater flow releases on the
Where: Original river channel about 2.5 miles upstream from North American Hydro’s Hatfield Hydro Project on the
When: Whitewater flow releases this year will occur between 11:00 and 2:00 on Saturdays May 30th, June 20th, and September 12th. In addition, if there is enough water July 11th and August 8th, releases will occur then as well. The release will be cancelled if flows at USGS Neillsville gauge measure less than 50 cfs 24 hours in advance of the release. Call 888.HYDROWI or 888.493.7694 for a flow update.
Description: This river segment is characterized as Class II and Class
May 30 11:00: 400 cfs; 12:00: 500 cfs; 1:00 600 cfs
June 20 11:00: 600 cfs; 12:00 700 cfs
Remainder dates to be determined by assessing previous flow releases
Directions: Take Highway K to just south of Hatfield and south of the
Sign In: Please be sure to sign in at the put-in point as use is being monitored for further evaluation.
Information: For more information, please call 888.HYDROWI or
Flow releases are provided by Hatfield Hydro (managed by North American Hydro Holdings) in conjunction with the Friends of the Black River, National Park Service, Wisconsin Department of Natural Resources, and American Whitewater.