Goulais

North of Searchmont

Reach banner
DifficultyIII
Length6.4 mi
Avg Gradient15 fpm
Reach Info Last UpdatedMarch 21, 2026

River Description

The Goulais is a fun class III river with a ledge and pool features and some I and II rock garden. It is mostly runnable in the spring.

Goulais River gauge, Canadian Real-Time Hydrometric Data

DIRECTIONS

  • Take Hwy 17 north from the Soo.
  • Turn right (east) on 556 toward Searchmont.
  • At the intersectio n of 556 and 532, stay on the pavement, which is 532, going north. Note that 556 turns into gravel and goes east toward Ranger Lake.
  • Cross bridge over Goulais and turn right (east) on Whitman Dam Road.
  • Road turns to gravel at mile 2.9.
  • 8.0 miles, see large waterfall.
  • 8.2 miles, park on road at top of waterfall. It's hard to find, but if you walk back down the road, there is a pretty good trail to the falls. Wait until you see the obvious trail before hiking down.
  • 15.5 miles is the road to the bridge take-out.
  • 16.2 miles, is the alternate take-out at a small campsite where the road meets the river.
  • 22.5 miles is the put-in, before you cross the bridge. It's obvious on your right.

River Features

Put In

Distance: 0.05 mi
Access Point

The put-in is located at a bridge that crosses the river.

2nd Rapid

Class: IIIDistance: 1.9 mi (approx.)
2nd Rapid

There is a rock island in the middle of the river; you can go either right or left.  Right can be shallow and not too difficult.  Left is a drop over a 3 to 4 foot ledge.  At tht bottom on the right is a pretty good wave to play.

5th Rapid Bottom

Class: IIIDistance: 3.6 mi (approx.)
5th Rapid Bottom

At the bottom of this white water section, the last feature is a river wide slide. River right is a bit different from river left. Regardless, it is a good place, and the last place, to play.

Alternate Take-out

Distance: 5.57 mi (approx.)
Take Out
Access Point
Alternate Take-out

About a mile upstream from the bridge take-out, on river right as the river bends left, the road is just on the top of the bank. It's about a 10' climb up the bank. There is also a small campsite there often occupied by the locals. There is no white water from here to the bridge take-out.

Take Out at Bridge

Distance: 6.36 mi
Take Out
Access Point

Take out at old bridge across river.


September 28th 2016. Whitman Dam road IS repaired but a bit rough from Mile 19 to put -in @ 23.0. Ran upper Goulias section. Gage reading 7.73 and falling. Put in @ around 1:00 pm, a bit late as the final stretch of the river which is a VERY fun rock garden we were looking straight into the sun and had quite a few collisions with surprise rocks. Overall Very fun and doable but would like a bit more water. A few of the 2 stage drops were a bit boney on the second drop. Took out where river touches road at small camp spot on river right. Didn't take very good notes on each feature as it was our first time running this section.

Road washed out at 23.7 miles, which is above the put in. The road is also washed out below the put in at 19.6 miles.

Good level. On the lower end of perfect. There were a number of good play waves in addition to the ledge features.