Klamath
06. K’utárawáx·u / Grizzly Hill Access to K’účasčas / Fall Creek Access(K’íka·c’é·ki Canyon)
Contributors
Revision Comment: minor edits and clean up
Revision Comment: updates to Gauge Description,Description
Revision Comment: updates to Gauge Description,Description
Revision Comment: Access update
Revision Comment: minor edit
Revision Comment: access update
Revision Comment: updated access
Revision Comment: minor revision
Revision Comment: updates to Description
Revision Comment: Added abstract and phonetics
Revision Comment: minor edits to reflect dam has been removed
Revision Comment: Updates, but still needs substantial revision
Revision Comment: updated sequencer number
Revision Comment: updates to Description
Revision Comment: Added links to adjoining runs
Revision Comment: Added detail on access until new facilities are built
Revision Comment: Added Wards Canyon to moniker
Revision Comment: Revised to names requested by Shasta Indian Nation
Revision Comment: updates to Description
Revision Comment: updates to Description
Revision Comment: updates to River Difficulty
Revision Comment: revised length to match GIS determined length. Minor edits to reduce "past/present" format now that dams are removed
Revision Comment: Updated geometry to reflect relocation of the river access put-in facility to its final site slightly downriver from what had been previously planned.
Revision Comment: updates to Gauge Description
Revision Comment: minor typo edit
Revision Comment: updates to Description
Revision Comment: updates to Other River Name
Revision Comment: copy edits and numerical corrections on gradient, length
Revision Comment: Adjusted upper end or run geometry to place it closer to actual (future) put-in site.
Revision Comment: corrected ave. gradient using LiDAR and GIS measurements
Revision Comment: updates to River Difficulty
Revision Comment: name revision
Revision Comment: new photo added
Revision Comment: name revision
Revision Comment: updates to Section Name
Revision Comment: name revision
Revision Comment: limited description to Wards Canyon
Revision Comment: Reach Adjusted to be just Wards Canyon
Revision Comment: updates to Section Name
Revision Comment: Revised and added detail regarding drawdown and dam removal as of January 2024
Revision Comment: Added link to Bill Cross's GoPro video: https://vimeo.com/688550243
Revision Comment: Added mention of displacement of Shasta Indians at Copco
Revision Comment: updates to Description
Revision Comment: Revised spelling to "Wards Canyon" and aded "dewatered" to the reach name. This long, combined run should be broken into individual runs.
Revision Comment: minor edits
Revision Comment: updates to Other River Name
Revision Comment: Updated info, added 2020 flow study details, corrected spelling of "Ward's Canyon" and "Iron Gate" for consistency.
Revision Comment: updates to County,Length,Putin Location,Takeout Location,Location Information
Revision Comment: updated name
Revision Comment: updated image position
Revision Comment: title edit
Revision Comment: minor title edit
Revision Comment: name edit
Revision Comment: photo added
Revision Comment: reach edits
Revision Comment: data removed
Revision Comment: content removed, transferred to reach 581
Revision Comment: 6/8/17 tg