Mill Creek

1. Upper Bridge to Mill Creek County Park

Reach banner

A large group did the run at 1.5' on the bridge gauge Dec 12, 2025. This was a low, enjoyable flow and enough water to get a raft down R2 style. There was one log jam in the cobble bar section below the last class IV and before the class III picks up again. The right bank has slid into the river here and created a bit of a mess, we portaged left.

Everything else was clean and good fun, remember to scout the first rapid below the put in bridge before putting on.

PG
Pete Giordano

Dec 18, 2020


Bridge gauge was 2' yesterday, 12/17/20. Good forgiving flow. Still wood in Triple Drop which is easily portaged and scouted along the road. The biggest drop in the Canyon section was clean although should be scouted for wood before committing. Great run for Class 3 boaters wanting to take a forgiving step up on a smaller creek.