Snoqualmie, Middle Fork

3 - Taylor River to Concrete Bridge(Upper Middle)

Reach banner

June 5, 2006

Trip Report

ReporterThomas O'Keefe

This is the most challenging drop on the Upper Middle where the river flows into a bedrock headwall on river left. It comes up as the first significant rapid from the put-in.