C) MenTosa: Hart Park Lane to W.Monarch Place or 4198 W.St.Paul Avenue (2.7 or 3.7 miles)


There had been a riverwide field of slab rock midway down Doyne Park. As of October, 2025, they have been pushed to each side of the river, leaving center channel largely unobstructed. The project to reconfigure the banks (rock walls) is still in progress downstream at this point. It is unknown whether the plans are to remove these slabs before the project is completed (I'm thinking that's likely), or if they will remain in the river.
Rob Smage
Slabs
Oct 20, 2025
n/a