Black (Mississippi Trib.)

E) Hatfield Dam to Power Plant (3.2 miles)

Reach banner

February 25, 2024

Scouting Trip

ReporterThomas O'Keefe

Stopped by to check out the access.

Scouting Trip – Black (Mississippi Trib.) – E) Hatfield Dam to Power Plant (3.2 miles) | American Whitewater