Cadron Creek
1) Hartwick Mill Run: Highway 124 to Pinnacle Springs (11 miles)(Batesville Mountain Run)
Trip Reports
Log in to add a report?
Water level was 1.5 feet at this run
?
Water level was 1.5 feet at this run
?
Water level was 1.5 feet at this run
?
Water level was 1.5 feet at this run
?
Cadron Creek in this section was run at water level 1.5
It was adequate for the 4 mile run with only one short portage required.