Cache Creek
2) Bear Creek Confluence to Rumsey(Rowboat Rapid/Rumsey Run)

Jul 21, 2026
Was planning on taking out at the Rumsey bridge and was suprised that they're in the middle of building a new bridge. The access trail is gone and I didn't see any access options so we went back up to Camp Haswell and set up shuttle. I'm assuming an access trail will be built after the project is done but wanted to make sure people are aware of the current situation.
Nov 30, 2022
On November 30, 2022 Yolo County held a formal Ribbon Cutting for the replacement bridge at County Road 40, commonly referred to as 'The Low Water Bridge' in many other guidebooks. The previous instream hazard has been removed and replaced with a high-clearance engineered bridge that should not pose a hazard.
Jan 19, 2019
Veronica Yovovich hitting a small rapid near the middle of the Rumsey run.
Jul 9, 2012
In 2010, this traditional take out was blocked and posted no trespassing by the landowner. In 2012 the take out was reopened and a formal trail was constructed to the river on the upstream river left side of the bridge. This was largely due to the ongoing efforts of a number of boaters to talk with the land owner and negotiate an understanding.
Jan 1, 1900
Steve is running an unnamed Class II rapid on Cache Creek