Feather, S. Fork
1. Little Grass Valley Reservoir to South Fork Diversion Dam
August 14, 2009
Trip Report
| Reporter | Paul Martzen |
> Because water was held in storage longer at Little Grass Valley this summer, releases beginning August 17 and continuing through the end of September will be in the boatable range. The planned schedule we have received from PG&E is as follows:
> August 17 – begin ramping from 100 cfs to 250 cfs. Hold 250 cfs through September 1.
> September 2 – ramp from 250 cfs to 300 cfs and hold at 300 cfs throughout September. This will take Little Grass Valley to its end of September elevation of 5,022 feet, keeping the boat ramps at the reservoir in service until the end of the month.
> The 300 cfs flow will probably continue into October as the fall drawdown begins. I will let you know the updated flow schedule as we get closer to October.
> Can you please add to the flow information posted that campgrounds at Little Grass Valley begin closing after Labor Day, although many stay open through the middle of September. The Sly Creek Campground will be closed on October 1.
> Thanks for posting the information.
> Kathy Zancanella
> South Feather Water and Power Agency