Chattooga

Section 4 - Route 76 Bridge to Tugaloo Lake Boat Ramp(Section 4)

Reach banner

July 25, 2007

Trip Report

ReporterMatt Muir

The USGS has apparently changed some stuff with their formatting. AW's web developer is working on fixing this glitch.

Meanwhile, this handy table can help you make sense of the reading from above:

flow (cfs) stage (ft)

240 1.2

300 1.3

350 1.4

420 1.5

490 1.6

570 1.7

650 1.8

740 1.9

840 2.0

940 2.1

1040 2.2

1160 2.3

1280 2.4

1400 2.5

1550 2.6