Neuse

3. Old Milburnie Road to Poole Road

Reach banner

Alerts

Log in to add an alert
Collected Debris on bridgesDavid Mulcahy
Jan 12, 2021

There are signs posted at put-in about obstructions down river.

The large bridges have large amounts of debris built up between pillars.
For the first bridge, we could get through on river left which had a branch which you could push over in whitewater kayaks but might need to portage in other boats. Unsure of the status for river right but center is full unpassable.

For second bridge, river left is entirely clear bewteen the two left-most pillars.

Based on run on 2021/01/11

Hank Stroup
Sep 3, 2012

Poole Road Access is temporariy closed due to Raleigh Greenway construction. Gate is locked, up you can still walk to the takeout area.


Articles

No articles