Cuyahoga

A1. Riverfront Park to Portage Trail Bridge

Reach banner
DifficultyI-II+(III)
Length0.7 mi
Avg Gradient40 fpm
GaugeCuyahoga River at Old Portage Oh
Flow Rate as of 54 minutes
508 cfsrunnable
Reach Info Last UpdatedFebruary 11, 2020

River Description

  • Attention: The river passes below the Route 8 bridge on this section. There is a tunnel with Left & Right channels for passage under Route 8. In the middle of the tunnel there is a gap that connects the two channels. The entrance to the tunnel is renown for having dangerous strainers and log piles. !!Always approach with caution!! The right side channel is usually clear enough for passage.

The LeFever and Sheraton dams were removed in July-Aug 2013,  This link provides a nice overview of the demolition and the video is well worth watching.  https://cfo.cityofcf.com/web/departments/service-directors-office/dam-restoration-project

Obviously, 200 years of being industrialized and covered by water will reveal 'opportunities' for improvement.  These post dam removal/river restoration efforts will need to address debris management from past bridge construction activities to trash and material removal which could create on water hazards and prevent recreational usage.

The City of Cuyahoga Falls has recently installed 2 new access points both located on river right.  The first is within Riverfront Park across from the Acme Store.  There is a fair amount of parking available.  http://www.fallsnewspress.com/news%20local/2016/07/12/photos-city-of-cuyahoga-hosts-ribboncutting-for-kayakcanoe-launch-area

The second access point is located just past the Portage Trail Bridge and is the last take out before the Class V Sheraton section.


River Features

Put In

Distance: 0 mi

Take Out

Distance: 0.9 mi
Take Out

DH
David Hill

Sep 8, 2016


Enjoying a beverage and the show from the deck of the Burntwood Tavern.

DH
David Hill

Jul 14, 2012


Here is an idea of what the gradient may look like once the 2 dams are removed in downtown Cuyahoga Falls.

DH
David Hill

Jul 11, 2012


The landing zone is a river wide rock shelf that is 2-2.5 feet below the surface at the low flow in this picture. A delayed boof and shorter boat will make the landing manageble. Note that there are large 'rooms' behind the curtain as the dam is hollow in design.

DH
David Hill

Feb 16, 2012


This figure presents river surface elevation data gathered during some of the River Trail projects. It presents a rough idea of how steep this section will become from Route 8, pass the 2 former dam sites, through the last drop below the Sheraton and to the start of the Ohio Edison Dam pool (~90 feet over 0.9 miles) and all within walking distances.

DH
David Hill

Feb 15, 2012


A low water view from below.

DH
David Hill

Feb 15, 2012


Doug and Enrique discussing the day when this dam is no more.

DH
David Hill

Feb 15, 2012


Looking downstream and wondering what lies below the dam pool.