Cuyahoga
A1. Riverfront Park to Portage Trail Bridge

Trip Reports
Log in to add a reportDavid Hill
Jul 14, 2012
Here is an idea of what the gradient may look like once the 2 dams are removed in downtown Cuyahoga Falls.
David Hill
Jul 11, 2012
The landing zone is a river wide rock shelf that is 2-2.5 feet below the surface at the low flow in this picture. A delayed boof and shorter boat will make the landing manageble. Note that there are large 'rooms' behind the curtain as the dam is hollow in design.
David Hill
Feb 16, 2012
This figure presents river surface elevation data gathered during some of the River Trail projects. It presents a rough idea of how steep this section will become from Route 8, pass the 2 former dam sites, through the last drop below the Sheraton and to the start of the Ohio Edison Dam pool (~90 feet over 0.9 miles) and all within walking distances.






