Nooksack, N. Fork

4 - Milepost 27 (Maple Falls) to South Fork Nooksack

Reach banner

Site visit to discuss potential plans to formalize the Maple Creek Access site with American Rivers, American Whitewater, and Washington Department of Natural Resources.

As part of the ongoing engineered log jam construction downstream of Milepost 27 near Maple Falls, low bridges have been placed over the channel and are impassable with limited to no portage around the upstream bridges. We advise all boaters to avoid the reach downstream of Milepost 27 from 8/2/2022 until 8/20/2022.

Please see the notification previously emailed to known river user lists for additional project information:

In an effort to ensure all river recreationists' safety and enjoyment on the river this summer, the Nooksack Indian Tribe’s Natural Resources Department would like to inform you that we will be constructing Engineered Log Jams (ELJ’s) and Flood Fence Structures as part of the North Fork Nooksack Maple Phase 2 Restoration Project this summer. The ELJ’s will be constructed within the active channel of the North Fork Nooksack River on both the right and left sides of the river.

The project is located between river miles 50.1 to 50.5 near Maple Falls, downstream of the informal river access at SR542 Milepost 27 and upstream of Maple Canyon near the Glen at Maple Falls development. Construction will occur July thru early September 2022. This is the last of two phases for the Maple Restoration Project.

Please be aware that bridges have been installed over the active channel as shown in the notification sign at the link below.  In addition, please watch for heavy equipment, construction, and coffer dams (super sacks) in the channel. Large warning signs will be placed upstream of the bridges to warn boaters to exit the river.

https://www.dropbox.com/s/30kvf2cqqj4uwx9/River%20User%20Notification%20Sign_Maple%20Phase%202.pdf?dl=0

The River User Notification Sign will be posted at popular river access locations and community boards in Glacier and Maple Falls. We will also be posting this information on the American Whitewater Association website. Please share this information with your club forums and/or share it with your fellow river users, guides, and clients. Please contact us if you or someone you know would like to be added to our river-user contact list for future updates.

Additionally, if you have suggestions for other river access sites where signs would be helpful or how to improve our notification process, please let us know; we’re open to feedback!

Thank you and have a safe and fun season on the water!

In an effort to ensure all river recreationalists’ safety and enjoyment on the river this summer, the Nooksack Indian Tribe’s Natural & Cultural Resources Department would like to inform you that we will be constructing Engineered Log Jams (ELJ’s) as part of the North Fork Nooksack Maple Phase 1 Restoration Project this summer. The ELJ’s will be constructed within the active channel of the North Fork Nooksack River on both the right and left sides of the river. The project is located between river miles 49.8-50.2 near Maple Falls, downstream of the informal river access at SR542 Milepost 27 and upstream of Maple Canyon near the Glen at Maple Falls development. Construction will occur July thru September 2021. This is the first of two phases for the Maple Restoration Project. Please be aware that bridges have been installed over the active channel. These bridges are low and impassible to boaters, please plan to portage around by exiting river left. In addition, please watch for heavy equipment, construction, and coffer dams in the channel. Large warning signs will be placed upstream of the bridges to warn boaters to exit the river. Please plan to portage around the project site! Photos of the bridges along with the River User Notification Sign are available upon request. Notification Signs have been posted at popular river access locations and community boards in Glacier and Maple Falls. Please post this information to your group forums and/or share with your fellow river users, guides and clients. If you or someone you know would like to be added to our river-user contact list for future updates, please contact us at the emails below. Additionally, if you have suggestions for other river access sites where signs would be helpful, or how to improve our notification and warning signs; please let us know, we’re open to feedback! Thank you and have a safe and fun season on the water! Eric Stover (Maple Project Manager)- estover@nooksack-nsn.gov Lindsie Fratus-Thomas (Farmhouse Project Manager)- lfratus@nooksack-nsn.gov 360-592-5140

Ran this section a month ago, there are at least 3 complete blockages between Maple Falls and Welcome(after the Maple Falls Canyon). The first one is a pair of channel spanning logs and makes for a pretty challenging portage. This section of the river changes with every flood cycle so always good to stay sharp and be prepared to pull off at a moment's notice...beautiful run though. Great for practicing thread the needle and pick your favorite braid.

There is significant human made wood hazards on this section of river that currently are poorly marked and should be completely avoided. I have requested of the NITNCRD post more signage on the river banks and at all possible put in's above this run. Below is an email copied from their Watershed Restoration Coordinator:

In an effort to ensure all river recreationalists’ safety and enjoyment on the river this summer, the Nooksack Indian Tribe’s Natural & Cultural Resources Department would like to inform you that we will be constructing 58 Engineered Log Jam (ELJ’s) and Flood Fence Structures as part of the NF Nooksack Farmhouse Phase 4 Restoration Project this summer. The structures will be built on both the right and left bank sides of the river and on channel islands within the active channel of the North Fork Nooksack River. The project is located between Maple Falls and Kendall, downstream of Maple Canyon (downstream of Maple Creek) near the Glen at Maple Falls development, river mile 47-48. Construction will occur July thru September 2020. The Tribe has constructed Phases 1, 2a, 2b and 3 of this project since 2014, so there are existing in-water structures to be aware of as well. This is the fourth and final phase of the Farmhouse Project. Please be aware multiple low bridges are, or will be installed, over the active channel to access portions of the project. In addition, please watch for heavy equipment, construction, coffer dams, existing and new in-water log structures. Large warning signs will be placed upstream of the bridges to warn boaters to exit the river. Please plan to portage around the project site! I have attached the River User Notification Sign that we have posted at popular put-in locations and community boards in the Glacier, Maple Falls and Kendall areas. Please contact me if you have suggestions for other put in locations where signs would be helpful. In addition, I have attached a Portage Route map showing the approximate bridge locations and preferred portage routes. Please forward this information to interested parties and be sure to notify your fellow river users, guides and clients.

Tour of access sites with the Forest Service.